Overview

Start Date: August 15, 2017
End Date:  September 30, 2017

Project Description

The Half Moon Bay Airport culvert repair project includes the replacement of two culverts below Taxiway Bravo (midfield taxiway) which are beyond their useful life. Failure of the culverts could cause a shift of taxiway pavement. The Airport is performing the work to maintain compliance with Federal Aviation Administration safety and design standards.
This project is being paid for with Federal Aviation Administration grant funding (90%) and Airport Enterprise Funds (10%).


Parking Restrictions:

Taxiway Bravo will be closed during construction.
 

Location

Half Moon Bay Airport, 9850 N. Cabrillo Hwy., Half Moon Bay, CA 94019
 

Contractor

Andreini Brothers, Inc.
(650) 726-2065
 

Public Works Contact

Gretchen Kelly, Airport Manager