Start Date: July 15, 2017
End Date: August 15, 2017
Project Description
The existing 2,300 feet of perimeter fencing on the south-end of the Half Moon Bay Airport is in poor condition. Airports must be fenced in order to meet Federal Aviation Administration requirements.
The perimeter fence will be replaced using material that is resistant to corrosion.
The south perimeter fence project is being paid for with Federal Aviation Administration grant funding (90%) and Airport Enterprise Funds (10%).
Location
Half Moon Bay Airport, 9850 N. Cabrillo Hwy., Half Moon Bay, CA
94019
Contractor
Ranch Fence, Inc.
(209) 966-5914
Public Works Contact
Gretchen Kelly, Airport Manager
gkelly@smcgov.org