Overview
Start Date: July 15, 2017
End Date: August 15, 2017
Project Description
The main windsock at the Half Moon Bay Airport is a navigational equipment that provides pilots with a visual indication of wind conditions near the runway during landing and takeoff operations, and is required by the Federal Aviation Administration.
The existing windsock at the Half Moon Bay Airport is beyond its useful life. The airport is replacing the windsock to maintain compliance with Federal Aviation Administration safety and design standards.
The windsock replacement project is being paid for with Federal Aviation Administration grant funding (90%) and Airport Enterprise Funds (10%).
Location
Half Moon Bay Airport, 9850 N. Cabrillo Hwy., Half Moon Bay, CA 94019
Contractor
Studebaker Brown Electric, Inc.
(916) 678-4660
Public Works Contact
Gretchen Kelly, Airport Manager