Project Start Date
Summer 2019
Location
A Street from El Camino Real to Third (3rd) Avenue
Second (2nd) Avenue from A Street to County/Daly City Limit
About the Project
The Project involves the roadway reconstruction of A Street from El Camino Real to Third (3rd) Avenue and Second (2nd) Avenue from A Street to County/Daly City limit in the Unincorporated Colma Area.
On A Street, the Project will include the reconstruction of the roadway with minimum 11.5-foot wide travel lanes and a 3-foot wide concrete valley gutter on the south side.
Second Avenue will include the reconstruction of the roadway with minimum 13.5-foot wide travel lanes and 3-foot wide concrete valley gutters on each side.
Contractor
Interstate Grading & Paving, Inc.
Public Works Contact
650-363-4100
A Street - Before
A Street - After
2nd Avenue - Before
2nd Avenue - After